Type of project: Supply of Materials-Equipment Item: Equipment for Methadone treatment facilities, Methadone dispensing points Value of contract: 5.925 billion VND Owner: PMU Year: 2016
Type of Construction: MEP Infrastructure Item: MEP System Value of contract: 19.819 Billion VND Invester: HACC1 Year: 2016
Type of contruction: MEP/Fire Protection Item: Oil supply and fire protection system Value of contract: 9.507 billion VND Investor: Pepsico Vietnam Year: 2016
Type of contruction: Fire Protection Item of works: Fire Protection System Value of Contract: 9.933 Billions VND Investor: Lam Dong II General Hospital Year: 2013
Type of contruction: MEP infrastructure Item: Pipe insulation Value of contract: 1.9 billion VND Investor: Formosa Ha Tinh Steel Corporation Year: 2015
Type of contruction: Fire Protection Item: Fire Protection and Public Address System Value of contract: 30.990 billion VND Investor: Formosa Ha Tinh Steel Corporation Year: 2015
Type of contruction: MEP Infrastructure Item of works: Piping of package BOQ for Mechanical Package 1 Value of Contract: 18.436 Billions VND Investor: Formosa Ha Tinh Steel Corporation (FHS) Year: 2013
Type of contruction: MEP Infrastructure Item of works: Tank Value of Contract: 4.782 Billions VND Investor: Phu Xuan Contruction and Trading Co. Ltd Year: 2013
Type of contruction: INFRASTRUCTURE Item of works: TRANSPORTATION INFRASTRUCTURE Value of Contract: 25.07 Billions VND Investor: BOT38 Joint Stock Company Year: 2013